General Containment Laboratory Risk Assessment 解答

其他 30 題 · 更新 2026-06-17

以下為「General Containment Laboratory Risk Assessment」e等公務園+測驗解答,共 30 題,供公務人員學習參考。

In addition to animal and persennel involved, and the characteristics of pathogens used, What is the other question to be asked in hazard identificantion step?the quantity and concentration of pathoge…(以下略)

  • the quantity and concentration of pathogen used or stored
  • the potential of aerosol generation by equipment or activities
  • Are sharp objects or glassware used
  • all of the above.

After assessing the risks associated with each step, mitigation strategies should be implemented that address any unacceptable risks if applicable.

Which one does not include in the local Risk Assessment Step?

  • budget
  • Hazard Identification
  • Risk Identification and Assessments
  • Develop and Implement Risk Mitigation.

Which question will not be asked in the hazard identificantion step?

  • the quantity and concentration of pathogen used or stored
  • the potential of aerosol generation by equipment or activities
  • Are sharp objects or glassware used
  • mitigation measures used.
  • pathogen and biotoxin
  • budget
  • equipment
  • facilities

Which one is the least effective mitigation measure to control the risk?

  • PPE
  • administration control
  • engineering control
  • elimination.

What is the first step to identify biohazards in lab?

  • identify and evaluate the work performed
  • divide an operation into multiple stepsto help identify andpresent hazzards for a particular job
  • Consider the pathogen to be handled (or stored) and its risk group level
  • none of the above.

Which one is the more effective mitigation measure to control the risk?

  • PPE
  • substitutiom
  • administration control
  • engineering control.

The risk asessment is an eazy job, which can be perfomed by anyone in the lab.

Which one is the definition of pathogen risk assessment?

  • the assessment of the risks associated with pathogens based on the inherent characteristics of the risks they pose to humans and animals
  • to identify, prioritize, and mitigate biosecurity risks associated with a laboratory’s biologically related assets
  • site-specific risk assessments involving pathogen and toxin activity
  • none of the above.

What is the component of a comprehensive overarching risk assessment?

  • local risk assessment
  • pathogen risk assessment
  • biosecurity risk assessment
  • all of the above.

The definition of risk assessment is to identify, analyze, and mitigate potential hazards and risk associated with them by conducting risk asessment.

Which one is the measure of administrative controls?

  • SOP
  • BSL-2
  • BSC
  • BSL-3

If the harm mitigation strategy does not reduce the risk to an acceptable level, the activity may have to be modified or the work terminated

After assessing the risks associated with each step, mitigation strategies should be implemented that address any unacceptable risks.

Risk indicator is a consequences of outcomes times likelihood of occurrence.

In addition to the step of review risk assessment, what is the local Risk Assessment Step included?

  • Hazard Identification
  • Risk Identification and Assessments
  • Develop and Implement Risk Mitigation
  • all of the above.

Which one is including in risk mitigation?

  • engineering controls
  • administrative control
  • PPE
  • all of the above.

Which is the most effective mitigation measure to control the risk?

  • PPE
  • administration control
  • engineering control
  • elimination.

Local risk assessments are site-specific risk assessments involving pathogen and toxin activity.

Which one is the definition of biosecurity risk assessment?

  • the assessment of the risks associated with pathogens based on the inherent characteristics of the risks they pose to humans and animals
  • to identify, prioritize, and mitigate biosecurity risks associated with a laboratory’s biologically related assets
  • site-specific risk assessments involving pathogen and toxin activity
  • none of the above.

What is the Reason for Conducting a Local Risk Assessment?

  • Identify who exposed to specific risks
  • Prioritize risks and their controls
  • Build awareness of biohazards and risks (safety culture)
  • all of the above.

Engineering controls mean change the way people work by personnel operation specification in containment zone or procedure, including label, selection and use of PPE, and training.

Which one is the definition of local risk assessment?

  • the assessment of the risks associated with pathogens based on the inherent characteristics of the risks they pose to humans and animals
  • to identify, prioritize, and mitigate biosecurity risks associated with a laboratory’s biologically related assets
  • site-specific risk assessments involving pathogen and toxin activity
  • none of the above.
  • pathogen and biotoxin
  • personnel
  • information
  • all of the above.

If the risk is considered acceptable or a decision is made not to implement a risk mitigation strategy, the reasons for the decision, including the decision-maker and process, should be clearly docume…(以下略)

Mitigation measures include the followings:

  • medical surveillance
  • training programs
  • emergency response plans
  • all of the above.

Which one is not including in engineering controls?

  • BSC
  • BSL-2
  • BSL-3
  • SOP.

Which statement is wrong about risk asessment?

  • it is a systematic process
  • it is performed by a competent person
  • it may be a situation or a place
  • all of the above.

Hazards that pose an unacceptable risk should be prioritized in the assessment.